Construction Engineering And Management Questions
Science topic
Construction Engineering and Management - Science topic
Explore the latest questions and answers in Construction Engineering and Management, and find Construction Engineering and Management experts.
Questions related to Construction Engineering and Management
Hi, are there any specifications about how to model BIM models in terms of object information and modeling style for specific applications or in general? For example, for quantity take-off, the specification specifies that the elements should contain concrete grade attributes etc. and the slab should be modeled with higher priority than beam in beam-slab joints like the attached picture shows. Are there such modeling specifications or guidelines? Thank you.
- 42.68 KB
Relevant answer
Thank you Temitope Akanbi . Yes I know LOD. But there seem no relevant specifications for the object information and modeling style mentioned in the question? Could you list some?
Overall Sciences ... Overall Designs... Do we need always to consider Factor of Safety ... ?
Relevant answer
Yes we have to consider factor of safety depending on standards we are following and type of material and structure.
Below are the few which are known to me. Which devices have you used to acquire building Point Clouds? What technology does the device use? I think many researchers are looking for choices of devices for their various projects and this post can help them to put the list on the table. I am adding below the Suggested Choices by respondents:
Relevant answer
Please take a look at Dotproduct DPI-10. It uses the latest intel sensors and SLAM algorithms.
Goal: This project is consist of two different questionnaire to get the opinion of experts in different locations. ( Location-based) There is no deadline for filling of this questionnaire. I believe that higher number of respondents will give much more accurate outcomes. Please recommend this questionnaire to your friends. That would help me too much. If you are interested in collaborating and working together please send a message to me.
Hi Ma'am/ Sir, Good Day. I would like to seek for your help with regards to Topic for Master Thesis Related to Construction Engineering and Management, and since I am in line of being a quantity surveyor I would like to ask for a thesis topic which is much related to Cost Management and Cost Control. Hoping to have a response from you. It will surely be a great help. Thank you very much in advance.
Relevant answer
Impact of risk analysis related to time, quality and cost
need suitable datasets to work on .
Looking for good information sources, both academic sources and practical examples. Informed opinions, comments and other types of answers are very much appreciated.
Relevant answer
Obviously... you will find more.
I am planning to build a website " ALL ABOUT CIVIL ENGINEERING " which aims to help students as well as engineers, my goal is to have a website wherein all the material regarding civil engineering is available on this website, who would like to be part of this website by providing me help to build this website, it will be totally educational website focusing on students and engineers, initially planned to keep search tab, providing my youtube links as free lectures, providing previous years question papers of various universities, IS codes and other countries codes pertaining to civil engineering, Q & A forum to ask questions related to civil engineering by logging in, separate tab for all notes of all subjects and practicals, and also separate section for the articles related to the advances in civil engineering. These are the initial requirements i have planned.
Relevant answer
You can review some similar websites like
I was wondering if anyone comes across any latest publications on the environmental indicators/measures for adopting prefabrication/modular in any construction applications (commercial/high-rise buildings, building services…etc).
Relevant answer
Hello Sherif, I am currently measuring the benefits of modular construction projects and have substantial literature relevant to your question. Kindly link up for a deeper discussion and possible collaboration Regards Ibrahim
Upon your experience on site and concrete on site, the phenomena of discolored of concrete might happens... how do you fix that?
Many informal settlements have insufficient capacity to forecast, check, handle and reduce disaster risk. These communities face a growing range of challenges including economic hardship, technological and social impediments, urbanisation, under-development, wildfire, climate change, flooding, drought, geological hazards and the impact of epidemics such as HIV/AIDS and COVID-19, sometimes termed 'the burden of disease'. The inability of these communities to withstand adversities affects the sustainability of initiatives to develop them. This is a question I would have asked during my masters degree research on Resilience in Disasters. I would like to know the opinions of other researchers as I would like to properly answer this question in a different research-related topic.
Relevant answer
i think the attitude and positivism of the community and their leaders is one big factor to add.
Can you Share with us a world class achievement or a well known World recognized project in which you contributed or participated effectively in its success?
Relevant answer
As a method of the research we used Automated system-cognitive analysis (ASC-analysis), which is a new innovative method of artificial intelligence: it also has its own software tool – an intelligent system called "Eidos" (open source software) [1, 2, 3]. The Eidos-X++ system differs from other artificial intelligence systems in the following parameters: - was developed in a universal setting, independent of the subject area. Therefore, it is universal and can be applied in many subject areas (http://lc.kubagro.ru/aidos/index.htm); - is one of the first domestic systems of artificial intelligence of the personal level, i.e. it does not take special training in the field of technologies of artificial intelligence from the user (there is an act of introduction of system "Eidos" of 1987) (http://lc.kubagro.ru/aidos/aidos02/PR-4.htm); - provides stable identification in a comparable form of strengh and direction of cause-effect relationships in incomplete noisy interdependent (nonlinear) data of very large dimension of numerical and non-numerical nature, measured in different types of scales (nominal, ordinal and numerical) and in different units of measurement (i.e. does not impose strict requirements to the data that can not be performed, and processes the data that is); - contains a large number of local (supplied with the installation) and cloud educational and scientific applications (currently 31 and 199, respectively) (http://lc.kubagro.ru/aidos/Presentation_Aidos-online.pdf); - provides multilingual interface support in 44 languages. Language databases are included in the installation and can be replenished automatically; - supports on-line environment of knowledge accumulation and is widely used all over the world (http://aidos.byethost5.com/map5.php); - the most time-consuming computationally, the operations of the synthesis models and implements recognition by using graphic processing unit (GPU) that some tasks can only support up to the solution of these tasks is several thousand times that really provides intelligent processing of big data, big information and big knowledge; - provides transformation of the initial empirical data into information, and its knowledge and solution using this knowledge of classification problems, decision support and research of the subject area by studying its system-cognitive model, generating a very large number of tabular and graphical output forms (development of cognitive graphics), many of which have no analogues in other systems (examples of forms can be found in: http://lc.kubagro.ru/aidos/aidos18_LLS/aidos18_LLS.pdf); - well imitates the human style of thinking: gives the results of the analysis, understandable to experts on the basis of their experience, intuition and professional competence.
What are the differences between Scope Creep and Gold Plating in Project Management. Often these two are confusing and misleading. Can we discuss it with real time examples? What are their effect on scope baseline? If so, do we need change request to deal with it?
Relevant answer
Dear Francine, Thanks a lot for your added discussion. Best Regards Haneefa
it is frequently reported that some international construction projects experiences time overrun due to delay in appointment of consultant by client. Our primary task is to prevent occurrence of this cause to prevent the arisen consequences. If the efforts were unsuccessful, mitigation measures should be taken. what are your taken prevention and mitigation suggestions? #delay #time #overrun #construction #project #management #mitigation
Relevant answer
I think if there is such risk in construction project they should increase time contingency. Because in that range the client may recruit the consultant while the constructor also may be free from penalty in that time range.
Trying to see diverse aspect of construction process that can be digitalized for effective construction project delivery. Can you please state the aspect of construction process that has been successfully digitalized in your country and the aspect that is yet to receive digitalization attention. Please be kind enough to state your country. Thanks.
Are platonian and aristotlean philosophy a bane or a boon as far as management science like construction management concerned?
Relevant answer
There are many relevant perspectives both in Aristotelian and Platonian philosophy. Examples can be: What is trust? What use are words? What is ethically good? What is practical wisdom? ... Safeer Ali The key is to put the many accurate and inspiring reflections in to a relevant context. Aristotelian and Platonian philosophy can also be utterly irrelevant.
Upon your site experience, How can you repair the concrete defects on manhole walls?
Relevant answer
I did not design buildings.
Upon your site experience, What are the main criteria need to be considered when design building against seismic?
Relevant answer
As written in: SEISMIC DESIGN PRINCIPLES by Gabor Lorant " The essence of successful seismic design is three-fold. First, the design team must take a multi-hazard approach towards design that accounts for the potential impacts of seismic forces as well as all the major hazards to which an area is vulnerable. Second, performance-based requirements, which may exceed the minimum life safety requirements of current seismic codes, must be established to respond appropriately to the threats and risks posed by natural hazards on the building's mission and occupants. Third, and as important as the others, because earthquake forces are dynamic and each building responds according to its own design complexity, it is essential that the design team work collaboratively and have a common understanding of the terms and methods used in the seismic design process. " Also " SEISMIC DESIGN FACTORS The following factors affect and are affected by the design of the building. It is important that the design team understands these factors and deal with them prudently in the design phase. Torsion: Objects and buildings have a center of mass, a point by which the object (building) can be balanced without rotation occurring. If the mass is uniformly distributed then the geometric center of the floor and the center of mass may coincide. Uneven mass distribution will position the center of mass outside of the geometric center causing "torsion" generating stress concentrations. A certain amount of torsion is unavoidable in every building design. Symmetrical arrangement of masses, however, will result in balanced stiffness against either direction and keep torsion within a manageable range. Damping: Buildings in general are poor resonators to dynamic shock and dissipate vibration by absorbing it. Damping is a rate at which natural vibration is absorbed. Ductility: Ductility is the characteristic of a material (such as steel) to bend, flex, or move, but fails only after considerable deformation has occurred. Non-ductile materials (such as poorly reinforced concrete) fail abruptly by crumbling. Good ductility can be achieved with carefully detailed joints. Strength and Stiffness: Strength is a property of a material to resist and bear applied forces within a safe limit. Stiffness of a material is a degree of resistance to deflection or drift (drift being a horizontal story-to-story relative displacement). Building Configuration: This term defines a building's size and shape, and structural and nonstructural elements. Building configuration determines the way seismic forces are distributed within the structure, their relative magnitude, and problematic design concerns.
Upon your site experience, What is the maximum storage time for cement in site?
Relevant answer
This really depends upon the type of cement and the conditions under which it is stored. At 20oC there should not be a problem so long as the relative humidity is maintained below 60%. Above this then there will be prehydration of the cement. This will lengthen the setting time and reduce strength development. If the relative humidity approaches 80% then the silicates in the cement will start to prehydrate and the loss in strength could well be ~30%. At higher temperatures then it is likely that the effects will be more pronounced.
If I am Interested in Construction and Structuctural Engineering what should be my Final Year Project? Please suggest Best Project Example?
Relevant answer
Dear Zeeshan, There are many topics which concern both construction and structuctural engineering that could be a final year graduate project for a student in civil engineering. I personally prefer the applicability of structuctural engineering's outputs in construction. Also, there is the relation between the variation in construction methods and the developments in structuctural engineering. You may chose the restrictions of structuctural engineering on the sector of construction in your country or the world. Best wishes.
Theoretically, what is the main stresses created on new concrete cast over old one, that might effect its bond?
Relevant answer
Concrete compressive strength
Upon your experience, what is the best material to connect new concrete over an old already cast? If you have any data regarding these materials.... please share...
Technical question about the possibility of replacing construction fine aggregate by river sand or desert sand...?
Relevant answer
Dear Faysal Asad .. Thanks for answering..
Technically, how can we stop leakage started on a basement due to increasing water table outside the building?
Relevant answer
The problem is great and I think the best solution is to reduce the level of groundwater. This can be done by digging wells around the building to prevent the groundwater from flowing into the site and then withdraw it by sucking pumps. Or it is possible to solve the problem using special liquids that freeze the water inside the soil, but this process needs time and high costs.
Major question.. give me your logical definition and whats the deference in application....
Relevant answer
Dear TIZA MICHAEL TORYILA ... Thanks for joining our discussion..
Based on your experience, how can I maintain quality construction, while constructing building?
Relevant answer
Dear Tim Belden .. thanks for answering..
In details ... need to know What is a work environment plan?
Relevant answer
Dear Djaafar Zemali .. thanks for answering and sharing your opinion ..
Upon your site experience and works, can you define the geopolymer concrete, ....
From your structural point of view and experience, what is the largest span lengths can be achieved with hollowcore plank systems?
Relevant answer
Dear Alaa Alsaad ... thanks for answering and for the drawing... Its really very good to achieve 15m span, ... Do you have some pics that can posted her, .. because achieving largest span is really a challenge..
With increase using of precast concrete members, ... can its damaged units reused...?
Relevant answer
Dear Arturo E Schultz .. thanks for answering ... and for references ... I really appreciate..
In practical, does it common practice to weld alternate ends for hollow core precast system.... need your opinion ?
Relevant answer
The ends of the plank's should not necessarily be welded,but rather be made to rest on support like beam and the beam is rebar and cast in- situ hold the ends. Please always ensure that the plank's length is designed to span between the available support.
Late in 2012, the coastal town of Lynn, Mass., petitioned Marinetek, a Finland-based manufacturer of harbor products, to replace its aging dock systems located within the town's seaport marina. An important question for both the town and contractor became, "Which solution will provide the durability and functionality necessary to withstand the elements and get the job done right?"
Relevant answer
The precast prestresses concrete structures with high strength of concrete can be designed in such a way that resulting stresses remain compressive through out the depth of the section. Thereby we can ensure that there is no tensile stress and no crack at all. Possiblility of ingress of hostile ions can be prevented for much longer time and also corrosion can be prevented. Performance based designed of concrete is another area wherein precast concrete can be designed for intended performance.
Within the wide use of precast concrete technology... does the precast concrete considered energy efficient?
Relevant answer
Dear Anil Kumar Thakur ... Thanks for answering.. So did you think that precast concrete could be considered energy efficient?
Concrete performance actually improves when several common industrial by products are added, so what are the recycling possibilities for precast concrete manufacturing?
Relevant answer
No problem Hussam. All the the best with your research.
How can inspecting precast?
Are there any limitations regarding the construction of houses by precast concrete system?
Relevant answer
Some of the limitations regarding the construction of houses by precast concrete system are: -Hgh Capital Cost -Sophisticated Connection Works -Transportation, Handling Difficulties and Modification Limitation
How much are "green building" and precast concrete elements related?
Relevant answer
I follow answers best regards
successfully and sustainable precast concrete system need to be achieved, ....
Relevant answer
I follow answers best regards
Its about industrial production of precast concrete elements?
Relevant answer
I follow answers best regards
Two similar term in civil engineering.. Foundation and Footing.. any differences between...?
Relevant answer
A footing is the bottom part of a foundation upon which the foundation can be supported.
With regards to I'm student in construction Engineering and management, interested in Project management (exception BIM), Thank you for your suggestions.
In your opinion, what are the most beneficial, most relevant, most applicable areas of the AEC research and practice in which Augmented, Mixed and Virtual Reality can assist, introduce significant benefits and/or facilitate major advancements/advantages?
Relevant answer
Thanks Peter Zeile and Aryan Shahabian for your posts. I agree with both however it is much more difficult to work in some areas than the others when it comes to VR and more specifically in AR. I've recently reviewed a couple of papers in this area which although we're good attempts missed on the research methodology 101 and that was a shame! We have also published a couple of papers recently mostly in conferences to test the ground and believe that there definitely are new boundaries to be explores and new grounds to cover. At SET, UoB, we have recently won some investment fund for developing AR/VR research in our school and acquired a good mix of AR/VR Technologies (HoloLens included). We are still to set up our new lab physically but good news is that we will be up and running soon. on another account in an independent research group I lead we are also concentrating on self-commissioned research in this area. The discussion here was what we have in our group as a regular topic and have recently decided to dedicate our next project to a couple of ideas which will hopefully come to fruition soon. Ill keep updating the post both in here and in a project I've set up on RG. Thanks again and hope we can develop some areas of joint research activities in the near future. Poorang
1. 7-8 years ago, I attended a National BIM symposium/seminar in Manchester in UK where one of the speakers who was the BIM manager for a leading multinational construction company used the phrase "BIM, BAM, BOOM" in her presentation which made everyone more laugh than think. 2. Couple of years later I attended a prominent conference where someone was introduced by the Head of School of the host university as a BIM guru/leading expert in the UK despite having no direct background in [building or construction] engineering. Just a few minutes after this introduction, the BIM guru, who was reporting to the conference organising committee, failed to zoom in on a MS Excel spreadsheet as per request of one of the audience who could not see the figures simply because he didn't know how to do it! Someone needed to go on the stage to do it for him! 3. Today BIM experts, researchers and policy makers who have got no idea about the paradigmatic differences between BIM and what it has succeeded are in abundance. 4. We hear/see/feel/sense/witness that BIM has not been able to deliver its promise and this is somewhat evidenced by the feedback we receive from the industry. My question is: "Has BIM really outlived its true value/promise or is it suffering from being bastardised (sorry this is not an F-word but quite an academic term) and subject to misuse/abuse as a result of our misunderstandings or lack of complete picture it entails?" Please join me in this open discussion with your opinions, stories and experiences on this topic.
Relevant answer
Great question and very good critical observations. BIM is not the "magic bullet" that it was portrayed as when it hit the market. It is just a tool, not a philosophy. BIM is merely a highly effective computer design tool that can be linked with estimating and scheduling tools to assist the project manager, but it still requires human intervention and a discipline to feed the tool and evaluate its output. Like all the other magic bullets that have arisen in our industry, critical path scheduling, partnering, alliancing, lean construction, to name a few, BIM does not guarantee success. Its the people on the project team that make that happen. We seem to forget that no matter what gimmicks we employ in the project delivery process, the project team must still plan, design, construct, commission, and maintain the completed project. That is and always has been a very difficult, very complex effort. The tools help sort out the complexities, but only if their practitioners understand and appreciate their limitations. I spent 20 years in the construction industry before moving to academia and have found that my academic colleagues tend to assume reality out of the project management equation because it greatly simplifies the analysis and leads to gee-whiz, publishable findings. I'll end this missive before I go off the deep end on this line of reasoning. Thank you very much for initiating this dialog. It is greatly needed. Cheers Doug
Hello! I would like to ask about (what papers required to be involved to apply value management on my project if I went to official institutions.. I may guess BOQ, Bills, drawning? what else.. Thanks!
Relevant answer
Thank you, as i mentioned before its for my graduation, I'm training at project of school which still under construction & I thought it might be as "throwing one stone onto two birds" , training and tracking the development of the construction which will enrich my experience ( My graduation project is the same project I trained) which I think this help in evaluating and estimation of the costs and pricing! - I did it, I downloaded all the sci-papers (publications) that are on google scholar & researchgate as will. Thank you so much, your replies mean a lot!
I just wonder if someone comes across a paper about the difference of public attitude in regards the output of public construction projects, whether it is different in tax-free countries compare to the taxed countries? in other words, would people in taxed countries be more demanding in regarding finishing projects on time and on cost as they feel the pay for that projects. compare to the tax-free countries where they would feel they did not pay for the project Thank you
Relevant answer
the answer of this question can be divided in two types. national and international contract or investment. i think the taxation effect the international investment rather than national investment or contract. any way it depend on the country economical policy
My intended research is titled: "Modern Methods of Construction: The potentials and challenges of using prefabrication technology for building modern houses in Afghanistan." This study is both for my "Master Thesis" and I am also very keen to publish at least one Journal paper based on the outcomes of my research and progress in this regard.
Relevant answer
Thanks Mr. Samuel Frimpong. Professor Peter E.D Love, as always thanks a ton to you for being there to help with my queries so far. Thank you so much Dr. Sunitha V. Doraisamy and Dr. Sevilay Demirkesen Çakır for providing more specific suggestions. I just wanted to see which method I can opt based on the ideas and objectives I had in my mind. I think analytical/quantitative method is what will best suit my this research. I am currently working on the questionnaire based on my research objectives and the literature review information.
I would like to get publications regarding challenges and problems associated with simultaneously managing spatially distributed construction sites
Relevant answer
Hello Omar, I suggest the following article: file:///C:/Users/master/Downloads/11SO-Kane.pdf Also, the following, although not a technical paper, does contain some useful tips:
I want to done a Tesis about of the Caña Guadúa such as a material of construction, because it is a renoval material an it is less expensive.
Relevant answer
Bamboo construction has great potential. Indeed, it is already widely used across much of the world. It is one of the fastest growing renewable resources and its properties make it suitable for use in a range of civil engineering applications (housing, civic buildings and low-rise office blocks). The use of bamboo as reinforcement in place of steel offers an opportunity to reduce the carbon footprint of construction, but durability may be compromised. In terms of a thesis (you don't say whether it's a Masters or PhD), you need to consider what research will be novel. Consider whether you wish to focus on structural performance, materials properties, structural design, lifecycle assessment, etc. All of these fields will offer the potential for research, just make sure that you are not "reinventing the wheel". In terms of resources, there are a number of publications in the field. SKAT produced a nice practical guide a few years ago. I don't normally like linking to unauthorised copies of books, but the link below should give you access.
What aspects of a pre BIM Design Manager's roles remain in a BIM project? What aspects of a pre BIM Design Manager's roles have changed in a BIM project?
Relevant answer
Good questions! Yes, it'll change. Schedule control is one of remain aspects. The aspect of design deliverables receiving has change to design team collaboration and integration keeper.
BIM is a step which could be taken only after architectural and structural design finishes. I want to incorporate BIM in project estimation and scheduling more efficiently and accurately. But there is a problem with BIM, it don't say anything about construction process, materials, equipment, labor, employees, time of event etc. If we can incorporate these things in BIM somehow, then we can be more specific an d almost accurate in scheduling and estimation.
Relevant answer
Hello Abhaysingh Thakur, It is very cool to share knowledge with other researchers. When we talk about BIM we have to consider a set of different software developed to deliver different uses of BIM. For BIM scheduling you can use: Synchro Software 4D BIM / VDC Construction Project Management Vico Software: 5D BIM Construction Software | Virtual Construction For BIM estimation you can use: Vico Software: 5D BIM Construction Software | Virtual Construction
My study concerns on conflict management and dispute resolution practice in construction industry context. I am relating human factor issue derived from national culture of the construction stakeholders with their styles and preferrance to resolve disputes arising out of a construction contracts (organisation vs. organisation). I am curious to know what theories exist out there to understand conflict/dispute resolution framework. Thanks!
Relevant answer
The most common theoretical framework for understanding behaviors, thoughts, and feelings in interpersonal conflict is the dual concern model of conflict (also known as conflict styles). Here are some articles: I strongly recommend two textbooks to get an overview of the various theoretical perspectives in conflict management: Social Conflict: Escalation, Stalemate and Settlement by Pruitt and Kim (and previously Rubin) Interpersonal Conflict by Wilmot and Hocker
1- Single-Server with Deterministic Arrivals and Services 2- Single-Server with Random Arrivals and Constant Service Rate 3- Multiple Servers
Relevant answer
The lecture notes found here: describe all you need.
Dear Sir, There is limited evidence in India showcasing the existence of frameworks or formulas for project managers to define the benefits and ROI of BIM Currently, decision makers rely on testimonials and case studies to hear what can be saved or what others have saved. Based on guidance form experts and available literatures I have come up with this approach to calculate ROI of BIM. Please forward this link to related personnel so they can try their projects on this calculator. Kindly go through link http://www.roibim.com/ which is approach to calculate ROI (Return on Investment) of adopting BIM (Building Information modeling) in construction project. BIM is the emerging field of construction and project management. For the client and all different stake holders of the projects this calculator will help to quantify harvested benefits of BIM assisted project. Please go through link and quantify benefits of your project by following mentioned instructions. For any further information or detailed calculation feel free to call or mail. Hardik Patel Mtech. Construction Engineering and Management CEPT University skype: er.hvpatel +91-951038945
Relevant answer
Dear Ivan, Thank you very much for your comments. Actually I am not professional IT person. The website has been prepared for easiness of process not for the promotion. Though i will ask my web developer to solve this issue. And I have shared this link in research gate to review my calculator. So researchers can try my calculator and give their comments so i can make it better. It will be validation of my research.
I have gone over many resources to figure out the clear picture about features and Characteristics of construction projects but still I believe the materials that presenting the topic inadequate
Relevant answer
Dear Sohaib, This paper can help you Jack Meredith, (1993),"Theory Building through Conceptual Methods", International Journal of Operations & Production Management, Vol. 13 Iss 5 pp. 3 – 11. Doi: http://dx.doi.org/10.1108/01443579310028120
Nowadays Different Recycling material and chemical are Used for Construction with Respect to Confidence of Lab Testing Result . But I am wondering , Olden days Without adding any Different Chemicals and recycling materials in the Construction activities, that Building life was as per standard design Life Span Achieved ; But Nowadays for Example In Concrete lot of chemicals , Recycling Materials are Adding for Construction activity , these type How can Achieved as per Standard life span of Building . Each and every Chemicals are having Different Reaction Characters............................... .
Relevant answer
We can not know the default age for these such structures from the viewpoint of use as the degrees of maintenance task as well as the misuse, leading to the short life of origin, so the periodic follow-up of the status of the building which was used is conducive to maintaining the age as planned and enable it to perform its role
We need to know the mechanical properties of the bamboo Dendrocalamus barbatus like modulus of elasticity, compression parallel to the fiber, etc.
Relevant answer
Thank you Mohammad, Are these properties for dendrocalamus barbatus? or whish species?
In construction of rise building,
Relevant answer
CPM Methods (High Level -Low Detail) Microsoft project , Primavera (Low Level -High Detail) Other tools such as Monte Carlo Simulations, Vico Control tools will also help in performing location-based Schedules resource levelling and scheduling considering uncertainty factors. these Tools can be further integrated with BIM tools (Navisworks , Tekla Structures) to produce Time Based simulation (4D)
Sir i am doing project on material management. can we compare the cost of materials used in cast in situ and precast construction. if so, please suggest suitable solution whether we can continue for project work. Thanks
Relevant answer
The first question that needs to be answered is whether the in-situ concrete and precast concrete are expected to achieve the same strength. The second is whether exactly the same types of materials are being used in the two methods (this will possibly not be true especially for reinforcement). If the two types of concrete making are expected to make concrete of the same strength, and the aggregates (coarse and fine) are also expected to be similar, you may find that the cost of materials for insitu concrete is more than that for precast. However, you need to test the significance of the difference in cost because it may be insignificant, except of course for rebar and additives (if required). Overall, I don't expect a wide difference in the cost of aggregates and binder using the two methods, but I do expect a wide difference in the labour and reinforcement costs of the two methods.
best modelling approach for uncertainty of pricing indices of construction project
Relevant answer
Dear Abbas, I agree with Floris that more specific help could be given with more specific details. Depending on which data you have, something you might also want to consider is Monte Carlo simulation. Best wishes, Francesco
what are the advantages of using VDC methods and how can they enhance the level of collaboration among parties in the project. also what are the commonly and widely used tools under VDC in delivering the projects
Relevant answer
Dear Yeshwanth, Take a read at the following sources for some ideas: Good luck, Simon Cleveland
can anyone help me out and have some information about that
Relevant answer
Hi Ms Nabhani, you might try very interesting research of James A. Reggia. Check the following links. Try to observe and rething the video. The subject is very interesting and important. It has a lot of prospective applications. james is a very nice person. If you need ask me for more info but the best way is to study Jamese's papers first. Good luck at your research, Jiri Kroc